This week marked another successful GeoDredge installation, this time for the Fuchs excavator. Specifically, a small modification to the masts was required to ensure bridge clearance. We’re proud of this installation and the seamless integration achieved.
![](https://www.ctsystems.eu/wp-content/uploads/2024/02/BGA-1024x771.jpg)